Mr. E   - Photo Gallery : Basement Rehab  Large room. Winter 2010

The block was not insulated, Older Code Fiberglass

Asbestos floor tile.


We seal and foam

Here the inspector missed the lack of nut on the connection

We tyvek tape all windows and foam added rigid foam to block wall

Primed, Floor installed with Pinwheel pattern


We foam the sill, and bottom at studs and caulk the sheathing to the stud. All nail holes, hammer holes sealed. Block is sealed



Showing Window foam and new higher R value fiberglass wall insulation



Primed waiting on Floor tile, final trim and doors



Primed, Student wanted to final paint.